Solid Masonry worked along side the NCC and the heritage masonry engineers to rebuild the parapet of the building near the War Museum. The brick work at the top of the wall had become deteriorated. The top 4 feet of the wall, which is 5 bricks thick (5 wyths), were rebuilt matching the existing decorative work.